Surf Break

Lat Long: 28.20° S 153.57° E

Dreamtime Surf Guide

Issued: 10 am 05 Nov 2026 (local time)

Forecast update in  hr  min

Today's Dreamtime sea temperature is
22.5°C
0.4° 

Dreamtime surf forecast is for near shore open water. Breaking waves will often be smaller at less exposed spots.

Dreamtime Surf Guide

Dreamtime in North Coast - New South Wales is an exposed beach break that has quite reliable surf. Summer offers the best conditions for surfing. The best wind direction is from the west northwest and there is no shelter here from cross shore breezes. Tends to receive a mix of groundswells and windswells and the best swell direction is from the southeast. The beach break offers both left and right hand waves. Sometimes crowded. Take care of - Rocks.

Dreamtime Spot Info

Type:Rating:Reliability:Todays Sea Temp*:
Beach3fairly consistent
22.5°C*ocean temperature recorded from satellite

Surfing Dreamtime:

The best conditions reported for surf at Dreamtime occur when a Southeast swell combines with an offshore wind direction from the West-northwest.

What's the best time of year to surf Dreamtime (for consistent clean waves)?

juneBest Season: winter
The best time of year for surfing Dreamtime with consistent clean waves (rideable swell with light / offshore winds) is during Winter  and most often the month of June. Clean surfable waves are typically found 31% of the time in June while 58% of the time it tends to be blown out. For the remaining 11% of the time it is considered too small by most surfers but may still be OK for beginners and groms at times.
clean
31%
Surfable waves that hold up well for longer rides in prevailing cross-offshore, offshore or light wind conditions.
blown out
58%
Surfable sized waves that are of poorer quality due to prevailing onshore, cross-onshore or windy conditions (may be preferable for kitesurfing).
too small
11%
Waves usually considered too small for good surf. Some wave-magnet breaks may still work though if conditions are right (on occasion).

Explore Dreamtime Location Map

Interactive Dreamtime surf break location map. View information about nearby surf breaks, their wave consistency and rating compared to other spots in the region. Current swell conditions from local buoys are shown along with live wind speed and direction from nearby weather stations. Click icons on the map for more detail.

  • Map Icons:
  • Break
  • Live Wave Height (m)
  • Live Wind Speed (km/h)
  • Surf Rating (10 Max)
  • Ocean Swells (m)
  • Wind Speed (km/h)
Map placeholder
Please note that some surf spot locations are approximate to protect their exact location while others are not shown at close zoom level.
Dreamtime Surf Forecasts:
Todays Surf Summary
Thursday, 5 November 2026, 14:41 Local Time
Thursday 05
2PM5PM8PM11PM
Wave (m)
0.6
E
0.6
E
0.6
E
1.7
SSE
Period (s) 9 9 8 6
Wind (km/h)
15
10
10
25
Wind State cross-
off
cross-
off
cross-
off
cross-
on

Swell History at Dreamtime

Surf stats for Dreamtime, see the swell variation by month or season on the history page here.

Wind History at Dreamtime

Wind stats for Dreamtime, see the variation in direction and stength by month or season on the history page here.


Nearest locationNearest